1. The asymmetric voltage and current flow rate generated after an asymmetric failure in the power system can be decomposed into three sequential networks by applying the symmetrical component method, analyzed according to the sequential voltage and current symmetry in each sequence network, and then synthesized into the actual ABC quantity, so that the asymmetric failure The calculation is greatly simplified.
2. The damage to the normal operation of the power system is mainly related to asymmetric failure or asymmetric operation of circuit breakers. Since only a few points in the whole power system have unequal three-phase impedance, the method of directly solving complex three-phase asymmetric circuits is generally not used, but a simpler symmetric component method is used for analysis.
3. The method of analyzing asymmetric short circuit is the symmetrical component method. Asymmetric short circuit. Simply put, single-phase grounded short circuit, two-phase grounded short circuit, two-phase short circuit, etc. in the short circuit type are asymmetric short circuits.Three-phase short circuit belongs to symmetrical short circuit. However, for three-phase short-circuits that occur at different points, short circuits are also asymmetric short circuits.
1. Causes of power grid asymmetry, ultra-high-voltage overhead transmission lines The road does not change. The structure of the transformer is asymmetrical. The existence of AC and DC transformers, the system load is unbalanced, and there are nonlinear components in the system.
2. Power system short-circuit faults can be divided into three types: three relative faults, asymmetric faults and single-phase ground faults. Asymmetric fault refers to the different size and polarity of the three-phase current, and there may be two or more combinations; single-phase ground fault refers to the grounding phenomenon in one phase, and measures need to be taken to ensure personal safety.
3. Asymmetric short-circuit failure, according to different short-circuit causes, the calculation method is as follows: single-phase grounded short-circuit Single-phase grounded short-circuit current is less than the three-phase short-circuit current at the same fault point, and vice versa, the single-phase short-circuit current is greater than the three-phase short-circuit current.
4. Symmetric fault: three-phase balance fault Asymmetric fault: single-line ground fault, double-line ground fault, line-to-line fault The cause of symmetry failure is a short circuit fault between the three phases at the same time, at which time the fault current and phase difference of the three phases are equal;The magnitude of the current and the phase angle between the three phases of asymmetric faults are not equal.
5. Borrow the existing answer to the first question: asymmetric failure will produce negative sequence current and voltage. Asymmetric grounding faults or disconnection faults will produce zero-sequence voltage, and whether to generate zero-sequence current depends on the grounding operation mode of the system.
Asymmetric faults of power systems are mainly divided into two categories: transverse asymmetrical faults and longitudinal asymmetrical faults. Horizontal asymmetry failure Two-phase short circuit This refers to the short circuit between the two phases in the power system. In this case, the two-phase current of the short circuit will increase, while the other phase current will decrease or be zero.
Zero-sequence impedance = positive-sequence impedance: the non-fault phase voltage is the pre-fault voltage, and the short-circuit current is equal to the three-phase short-circuit current. Zero-sequence impedance is infinite: the non-fault phase voltage is 5 times the voltage before the failure, and the short-circuit current is the three-phase short-circuit current √3/2.
Asymmetric operation of the power grid, including short-circuit faults and disconnection faults. Short-circuit faults include single-phase grounding, interphase short-circuit and interphase short-circuit grounding faults. In the neutral point grounding system, grounding faults and disconnection faults will generate zero-sequence current, and of course there is also negative-sequence current. Interphase short circuit does not produce negative sequence components.
Crafted wood products HS code references-APP, download it now, new users will receive a novice gift pack.
1. The asymmetric voltage and current flow rate generated after an asymmetric failure in the power system can be decomposed into three sequential networks by applying the symmetrical component method, analyzed according to the sequential voltage and current symmetry in each sequence network, and then synthesized into the actual ABC quantity, so that the asymmetric failure The calculation is greatly simplified.
2. The damage to the normal operation of the power system is mainly related to asymmetric failure or asymmetric operation of circuit breakers. Since only a few points in the whole power system have unequal three-phase impedance, the method of directly solving complex three-phase asymmetric circuits is generally not used, but a simpler symmetric component method is used for analysis.
3. The method of analyzing asymmetric short circuit is the symmetrical component method. Asymmetric short circuit. Simply put, single-phase grounded short circuit, two-phase grounded short circuit, two-phase short circuit, etc. in the short circuit type are asymmetric short circuits.Three-phase short circuit belongs to symmetrical short circuit. However, for three-phase short-circuits that occur at different points, short circuits are also asymmetric short circuits.
1. Causes of power grid asymmetry, ultra-high-voltage overhead transmission lines The road does not change. The structure of the transformer is asymmetrical. The existence of AC and DC transformers, the system load is unbalanced, and there are nonlinear components in the system.
2. Power system short-circuit faults can be divided into three types: three relative faults, asymmetric faults and single-phase ground faults. Asymmetric fault refers to the different size and polarity of the three-phase current, and there may be two or more combinations; single-phase ground fault refers to the grounding phenomenon in one phase, and measures need to be taken to ensure personal safety.
3. Asymmetric short-circuit failure, according to different short-circuit causes, the calculation method is as follows: single-phase grounded short-circuit Single-phase grounded short-circuit current is less than the three-phase short-circuit current at the same fault point, and vice versa, the single-phase short-circuit current is greater than the three-phase short-circuit current.
4. Symmetric fault: three-phase balance fault Asymmetric fault: single-line ground fault, double-line ground fault, line-to-line fault The cause of symmetry failure is a short circuit fault between the three phases at the same time, at which time the fault current and phase difference of the three phases are equal;The magnitude of the current and the phase angle between the three phases of asymmetric faults are not equal.
5. Borrow the existing answer to the first question: asymmetric failure will produce negative sequence current and voltage. Asymmetric grounding faults or disconnection faults will produce zero-sequence voltage, and whether to generate zero-sequence current depends on the grounding operation mode of the system.
Asymmetric faults of power systems are mainly divided into two categories: transverse asymmetrical faults and longitudinal asymmetrical faults. Horizontal asymmetry failure Two-phase short circuit This refers to the short circuit between the two phases in the power system. In this case, the two-phase current of the short circuit will increase, while the other phase current will decrease or be zero.
Zero-sequence impedance = positive-sequence impedance: the non-fault phase voltage is the pre-fault voltage, and the short-circuit current is equal to the three-phase short-circuit current. Zero-sequence impedance is infinite: the non-fault phase voltage is 5 times the voltage before the failure, and the short-circuit current is the three-phase short-circuit current √3/2.
Asymmetric operation of the power grid, including short-circuit faults and disconnection faults. Short-circuit faults include single-phase grounding, interphase short-circuit and interphase short-circuit grounding faults. In the neutral point grounding system, grounding faults and disconnection faults will generate zero-sequence current, and of course there is also negative-sequence current. Interphase short circuit does not produce negative sequence components.
Ceramic tiles HS code classification
author: 2024-12-24 02:20Trade data analysis for small businesses
author: 2024-12-24 01:57Trade data-driven policy analysis
author: 2024-12-24 01:54Processed foods HS code mapping
author: 2024-12-24 01:04Trade data analysis for small businesses
author: 2024-12-23 23:42Pharma finished goods HS code references
author: 2024-12-24 02:18Automated trade documentation tools
author: 2024-12-24 02:03Global trade corridor analysis
author: 2024-12-24 01:30HS code-based compliance cost reduction
author: 2024-12-24 00:39How to manage trade credit risks
author: 2024-12-23 23:48486.34MB
Check647.48MB
Check299.89MB
Check262.29MB
Check368.41MB
Check329.73MB
Check932.27MB
Check366.84MB
Check158.61MB
Check479.15MB
Check257.47MB
Check739.11MB
Check522.76MB
Check791.82MB
Check247.13MB
Check514.64MB
Check668.49MB
Check895.96MB
Check655.48MB
Check645.28MB
Check812.39MB
Check274.35MB
Check521.98MB
Check793.42MB
Check825.73MB
Check343.32MB
Check253.67MB
Check163.19MB
Check479.23MB
Check215.63MB
Check559.63MB
Check227.33MB
Check913.71MB
Check781.78MB
Check726.36MB
Check123.74MB
CheckScan to install
Crafted wood products HS code references to discover more
Netizen comments More
1402 Latin America HS code classification
2024-12-24 02:25 recommend
1189 Trade data-based price benchmarks
2024-12-24 02:11 recommend
2917 HS code-based quota management
2024-12-24 00:50 recommend
225 Cost-benefit analysis of export markets
2024-12-24 00:45 recommend
1850 How to reduce supply chain overheads
2024-12-24 00:31 recommend